Headstone Lane Civils

Project: Civil Engineering Works and 6-Line UTX Construction Client: Network Rail Location: Headstone Lane, Harrow, London

Project Introduction

Coleman Rail successfully delivered a fully project managed railway civil engineering package of works including a 6-line UTX at Headstone Lane, Harrow, as part of the London Overground Capacity Project. Coleman Rail’s scope as responsible contractor, covered the provision and installation of all necessary temporary sheet piling in advance of the permanent installation. The subsequent construction of permanent works included the use of a thrust boring auger, removal of spoil as work proceeded and careful management of plant and materials, both in and out of the work site.

The works were subject to ALO whilst working within the Reception Pit located in the cess of the down slow line, whereby the excavator was fitted with a height and slew restrictor. Removal of the temporary sheet walings and piles in this area were also subject to track possession.

Works were successfully completed on behalf of the client in accordance with the designated programme, both without incident and accident.

Project Deliverables

Construction of a UTX at Headstone Lane beneath 6 lines. The works covered the construction of the temporary works for the thrust and reception pit and also the construction of the permanent
chambers. Temporary works support included interlocking sheet steel piles driven by EMV, the excavation of pits, concrete works, chamber construction, removal of spoil with a 6 tonne dumper and moving materials and equipment to and from site using a 14 tonne excavator (reception pit side) and a 24 tonne excavator (thrust pit side). The sequence of deliverables was as follows:

Challenges and Solutions

Benefits